A pan stirrer mounted above the top tube plate of a floating calandria pan was retrofitted to a 36 m3 unit at Rocky Point mill for the 1985 crushing season. This installation, by Goninans N.Q. Pty Ltd, followed reports by Reinefeld (1982 and 1983) on the